-
1
Technical due diligence of technical gap analysis of wind turbine generator
DNV
2023.01
~
2023.03
Due diligence of Vestas offshore wind turbine for entering Korea offshore wind market
-
2
Development of structural response estimation system based on digital twin technology
SAMSUNG HEAVY INDUSTRIES
2023.01
~
2023.11
Predicting stress at uncensored locations using relative Response Amplitude Operator (RAO) method
-
3
A study on the development trends of the IMO Type-C cargo containment system for fuel tank application
KRISO
2022.11
~
2022.12
Survey IMO type-C tank design basis for LNG and other liquefied gas applications
-
4
Design optimization of chain stopper and Panama chock for ship application
TankTech
2022.10
~
2022.12
Weight optimization of ship equipment by numerical simulations
-
5
Development of cargo tank of liquid helium for ultra cryogenic application (20K deg.)
National Reserach Foundation of Korea
2022.09
~
2023.01
Development (basic design and production) of cargo tank for liquid helium
-
6
Structural safety assessment of rockfall protection system
NUENGIT
2022.06
~
2022.09
Nonlinear dynamic transient analysis of rockfall protection system
-
7
Technical advisory for conceptual design of a floater for an offshore wind turbine generator application
SOIC(Ship and Ocean Industries R&D Center) -Taiwan
2021.12
~
2022.02
Technical advisory for the conceptual design verification of offshore floating applications
-
8
Design Verification of Offshore Substructure for Wind Measurement Application
RWE
2021.12
~
2022.02
Design verification of offshore foundation structures
-
9
FE assessment type C LNG fuel tank for FGSS application
JungWoo ENE
2020.12
~
2021.02
LNG Type C Tank basic design, FE assessment
-
10
Prioritizing assessment of RNA product baseline against Korean law for identified systems in RNA2
SIEMENS Gamesa
2020.11
~
On Going
Wind Turbine Technical Due Diligence
-
11
FE assessment type C LNG fuel tank for FGSS application
TankTech
2020.08
~
2020.04
LNG Type C Tank basic design, FE assessment
-
12
Project certification for Jeonnam offshore wind farm phase 1
SK E&S
2020.08
~
On Going
Project Certification of offshore wind farm
-
13
Pre-feasibility study on the status of the wind energy business in South Korea
ClassNK
2020.08
~
2019.09
Project pre-feasibility study
-
14
Development of Design Basis of Jeju Hanlim offshore wind farm development
VisionPlus
2019.11
~
2020.01
Development & draft Design Basis
-
15
Technical due diligence of a tower failure investigation of 2MW onshore wind turbine generator application 2nd phase
Hyosung HI
2019.04
~
2019.05
Root cause analysis of tower failure event
-
16
Technical due diligence of a floating solar power system
ClassNK
2019.03
~
2019.05
Technical due diligence of floating application
-
17
The implementation of Wind Energy Certification and Advisory Business
TUV-SUD
2019.02
~
On Going
Type Certification, Project Certification, Technical due diligence
-
18
Pre-feasibility studies on 500MW offshore wind farm
YooYoun ENE
2018.11
~
2018.12
Project feasibility study
-
19
Training of manufacturing surveillance for offshore wind farm development
CR (Taiwan) classification society
2018.11
~
2022.12
Manufacturing surveillance for offshore wind farm application
-
20
Blade failure investigation
TUV-SUD
2018.11
~
2018.12
Root cause assessment of blade failure of wind turbine generator
-
21
Pre-feasibility study for offshore wind farm developments of South Korea
TUV-SUD
2018.09
~
2018.12
Root cause assessment of blade failure of wind turbine generator
-
22
Development of hybrid loading arm cryogenic handling system for LNG buckling system application
Korea Institute for Advancement of Technology
2018.07
~
On Going
Design assessment of handling system for LNG bunkering application
-
23
Project feasibility study on Eco-friendly energy town in Mongolia
Korean foundation for quality
2018.07
~
2018.08
Design assessment of handling system for LNG bunkering application
-
24
Development project certification regulation in South Korea for offshore wind farm
Korean agency for technology and standards
2018.05
~
2018.11
Project certification
-
25
Market survey for Korea offshore wind market
DNV
2018.04
~
2018.06
Project pre-feasibility study
-
26
Technical due diligence & project certification of an offshore wind farm development
CR (Taiwan) classification society
2018.04
~
2018.12
Annual energy production and project certification project for offshore wind farm application
-
27
Market status analysis in Pakistan Rojhan
DNV
2018.03
~
2018.03
Market project pre-feasibility study on Pakistan
-
28
Development of owner’s engineering business model
Korea Leading Energy Management
2018.02
~
2018.03
Owner’s engineering for offshore wind farm development
-
29
Training – technical due diligence
CR (Taiwan) classification society
2018.01
~
2018.03
Training service on technical due diligence for wind farm development
-
30
Project feasibility study on 45 MW Chungsapo offshore wind farm development
TUV-SUD
2017.12
~
2017.12
Project feasibility study
-
31
Project feasibility study on Imja offshore wind farm development
TUV-SUD
2017.12
~
2017.12
Project feasibility study
-
32
Experimental and numerical assessment of DCS16 LNG cargo containment system
Daewoo Shipbuilding & Marine Engineering Co., Ltd.
2016.10
~
2017.11
LNG 화물창용 단열시스템의 설계강도 평가
-
33
Structural assessment of a membrane type LNGC cargo containment system
Daewoo Shipbuilding & Marine Engineering Co., Ltd.
2016.06
~
2018.07
Project consultancy for renewable energy application
-
34
The implementation of Wind Energy Certification and Advisory Business
ClassNK
2016.06
~
On Going
Type Certification, Project Certification, Technical due diligence
-
35
Technical consulting of renewable energy application for ClassNK
MOVENA
2016.03
~
2016.12
Project consultancy for renewable energy application